{"id":1131,"date":"2011-06-09T07:52:06","date_gmt":"2011-06-09T07:52:06","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=1131"},"modified":"2016-03-18T07:53:12","modified_gmt":"2016-03-18T07:53:12","slug":"fjalimi-i-drejtorit-menaxhues-te-kek-ut-arben-gjukaj-gjate-vizites-ne-mihjen-sibovci-jugperendimor","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/fjalimi-i-drejtorit-menaxhues-te-kek-ut-arben-gjukaj-gjate-vizites-ne-mihjen-sibovci-jugperendimor\/","title":{"rendered":"Fjalimi i drejtorit menaxhues t\u00eb KEK-ut, Arben Gjukaj gjat\u00eb vizit\u00ebs n\u00eb Mihjen Sibovci Jugper\u00ebndimor"},"content":{"rendered":"<p>T\u00eb nderuar t\u00eb pranish\u00ebm, miq dhe bashk\u00ebpun\u00ebtor\u00eb<\/p>\n<p>Kam k\u00ebnaq\u00ebsin\u00eb e madhe q\u00eb sot t\u00eb jem n\u00eb mesin tuaj dhe nikoqir i k\u00ebsaj ngjarje p\u00ebr t\u00eb vler\u00ebsuar pun\u00ebn e b\u00ebr\u00eb n\u00eb Minier\u00ebn e Sibovcit Jugper\u00ebndimor dhe p\u00ebr t\u00eb fal\u00ebnderuar punonj\u00ebsit q\u00eb jan\u00eb angazhuar n\u00eb k\u00ebt\u00eb vep\u00ebr t\u00eb p\u00ebrmasave t\u00eb m\u00ebdha, si dhe fal\u00ebnderimi dhe respekti i ve\u00e7ante p\u00ebr donator\u00ebt- Bashk\u00ebsin\u00eb Evropiane p\u00ebr mb\u00ebshtetjen e tyre p\u00ebr k\u00ebt\u00eb projekt.<\/p>\n<p>Mihja \u201cSibovci Jugp\u00ebrendim\u201d (SJP) \u00ebsht\u00eb projekti m\u00eb i madh energjetik gjat\u00eb dy dekadave t\u00eb fundit n\u00eb Kosov\u00eb. Kapacitetet e qymyrit t\u00eb eksploatush\u00ebm t\u00eb SJP jan\u00eb 124 milion\u00eb ton\u00eb, t\u00eb mjaftueshme deri n\u00eb fund t\u00eb jet\u00ebs teknologjike t\u00eb termocentraleve ekzistuese, p\u00ebrkat\u00ebsisht t\u00eb TC \u201cKosova A\u201d dhe \u201cKosova B\u201d. SJP \u00ebsht\u00eb pjes\u00eb e Sibovcit ku jan\u00eb t\u00eb evidentuara dhe v\u00ebrtetuara rreth 1 miliard ton\u00eb rezerva gjeologjike t\u00eb th\u00ebngjillit.<\/p>\n<p>Hapja e mihjes ka nisur n\u00eb korrik t\u00eb vitit 2007 me largimin e djerrin\u00ebs, me pajisje t\u00eb parehabilituara, nd\u00ebrsa eksploatimi i qymyrit p\u00ebr furnizim t\u00eb termocentraleve ka nisur n\u00eb muajin shtator 2010.<\/p>\n<p>Funksionalizimi i <strong>Sistemit t\u00eb Par\u00eb t\u00eb djerrin\u00ebs<\/strong> \u00ebsht\u00eb p\u00ebrmbyllur dhe sot jemi d\u00ebshmitar\u00eb t\u00eb pun\u00ebs s\u00eb vazhdueshme t\u00eb k\u00ebtij sistemi, q\u00eb ka ndihmuar dhe ka b\u00ebr\u00eb t\u00eb mundur hapjen e minier\u00ebs s\u00eb re t\u00eb qymyrit n\u00eb vendin ton\u00eb dhe rrjedhimisht na ka mund\u00ebsuar t\u00eb sigurojm\u00eb vazhdim\u00ebsin\u00eb n\u00eb furnizim me qymyr t\u00eb termocentraleve ekzistuese.<\/p>\n<p>N\u00eb sistemin e par\u00eb t\u00eb djerrin\u00ebs jan\u00eb vendosur ekskavatori i riparuar komplet E10B, Palos\u00ebsi P3B dhe kat\u00ebr shirita transportues b1600 mm. Ky sistem \u00ebsht\u00eb kompletuar dhe \u00ebsht\u00eb b\u00ebr\u00eb funksional n\u00eb fillim t\u00eb dhjetorit 2009. Nd\u00ebrtimi i Sistemit t\u00eb Par\u00eb t\u00eb Djerrin\u00ebs ka pasur koston prej 34.74 milion\u00eb euro. Prej k\u00ebsaj shume, Bashkimi Evropian ka financuar si donacion shum\u00ebn prej 15 milion\u00eb eurosh, nga Buxheti i Kosov\u00ebs jan\u00eb donacion 3 milion\u00eb euro, nd\u00ebrsa pjesa tjet\u00ebr prej 16.74 milion\u00eb euro jan\u00eb financim nga KEK-u p\u00ebrmes kredis\u00eb afatgjat\u00eb t\u00eb siguruar nga Buxheti i Kosov\u00ebs.<\/p>\n<p>Riparimi i Ekskavatorit E10B ka filluar n\u00eb muajin shkurt 2009 dhe ka zgjatur deri n\u00eb n\u00ebntor 2009. Kostoja e riparimit \u00ebsht\u00eb 13.65 milion\u00eb euro. Financimi \u00ebsht\u00eb b\u00ebr\u00eb nga donacionet e Bashk\u00ebsis\u00eb Evropiane n\u00eb vler\u00eb prej 10.58 milion\u00eb euro dhe donacioni nga Buxheti i Kosov\u00ebs n\u00eb vler\u00eb prej 3.07 milion\u00eb euro.<\/p>\n<p><em>\u00a0<\/em>Riparimi i Palos\u00ebsit P3B ka filluar ne muajin shkurt 2009. Kostoja e riparimit \u00ebsht\u00eb 9.15 milion\u00eb euro. Financimi \u00ebsht\u00eb b\u00ebr\u00eb nga donacioni prej Bashk\u00ebsis\u00eb Evropiane n\u00eb vler\u00eb prej 7.06 milion\u00eb euro dhe nga KEK p\u00ebrmes huas\u00eb prej Buxheti i Kosov\u00ebs n\u00eb vler\u00eb prej 2.08 milion\u00eb euro.<\/p>\n<p><em>\u00a0<\/em>Riparimi i shiritave transportues ka filluar ne muajin shkurt 2009). Kostoja e riparimit t\u00eb shiritave transportues \u00ebsht\u00eb 11.16 milion\u00eb euro. Financimi \u00ebsht\u00eb b\u00ebr\u00eb nga KEK-u p\u00ebrmes huas nga Buxheti i Kosov\u00ebs.<\/p>\n<p><strong>\u00a0<\/strong>Riparim i sistemit\u00a0 \u00ebsht\u00eb kryer me nj\u00eb teknologji shum\u00eb t\u00eb avancuar q\u00eb d.m.th. komplet sistemi i komandimit \u00ebsht\u00eb p\u00ebrmes\u00a0\u00a0\u00a0 PLC \u2013 sistemit\u00a0\u00a0 dhe sistemit\u00a0 Wireless.<\/p>\n<p>Kjo linje vet\u00ebm muajin e kaluar ka zhvendos mbi 350 000 m3 djerrin,qe garanton se kapacitetin e planifikuar sipas projektin do te realizohet.<\/p>\n<p>M\u00eb lejoni q\u00eb edhe nj\u00ebher\u00eb p\u00ebr t\u00ebr\u00eb pun\u00ebn e b\u00ebr\u00eb n\u00eb l\u00ebvizjen e k\u00ebsaj makinerie\u00a0\u00a0t\u00eb r\u00ebnd\u00eb, riparimin e saj dhe sigurimin e asaj t\u00eb re t\u00eb nevojshme p\u00ebr k\u00ebt\u00eb proces, si dhe n\u00eb funksionalizimin e vet\u00eb sistemit, t\u00eb ofroj mir\u00ebnjohjen dhe fal\u00ebnderimin tim m\u00eb t\u00eb sinqert\u00eb p\u00ebr punonj\u00ebsit e Mihjes s\u00eb KEK-ut, si dhe donator\u00ebt p\u00ebr ofrimin e mb\u00ebshtetjes s\u00eb tyre financiare p\u00ebr k\u00ebt\u00eb projekt. Fjala \u00ebsht\u00eb p\u00ebr Bashkimin Evropian dhe Qeverin\u00eb e vendit ton\u00eb.<\/p>\n<p>Ju fal\u00ebnderoj edhe nj\u00ebher\u00eb t\u00eb gjith\u00ebve dhe ndihem jasht\u00ebzakonisht mir\u00eb q\u00eb p\u00ebrkund\u00ebr pesimizmit t\u00eb madh q\u00eb projekti nuk do t\u00eb realizohej me koh\u00eb kur ka nisur s\u00eb implementuari, ja dol\u00ebm t\u00eb d\u00ebshmojm\u00eb se mund t\u00eb zbatojm\u00eb projekte kapitale t\u00eb k\u00ebtyre p\u00ebrmasave n\u00eb koh\u00eb t\u00eb duhur p\u00ebr t\u00eb pasur mjaft qymyr p\u00ebr prodhimin e energjis\u00eb elektrike n\u00eb termocentralet tona.<\/p>\n<p>Ju faleminderit!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>T\u00eb nderuar t\u00eb pranish\u00ebm, miq dhe bashk\u00ebpun\u00ebtor\u00eb Kam k\u00ebnaq\u00ebsin\u00eb e madhe q\u00eb sot t\u00eb jem n\u00eb mesin tuaj dhe nikoqir i k\u00ebsaj ngjarje p\u00ebr t\u00eb vler\u00ebsuar pun\u00ebn e b\u00ebr\u00eb n\u00eb Minier\u00ebn e Sibovcit Jugper\u00ebndimor dhe p\u00ebr t\u00eb fal\u00ebnderuar punonj\u00ebsit q\u00eb jan\u00eb angazhuar n\u00eb k\u00ebt\u00eb vep\u00ebr t\u00eb p\u00ebrmasave t\u00eb m\u00ebdha, si dhe fal\u00ebnderimi dhe respekti i&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1132,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-1131","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/1131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=1131"}],"version-history":[{"count":1,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/1131\/revisions"}],"predecessor-version":[{"id":1133,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/1131\/revisions\/1133"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media\/1132"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=1131"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=1131"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=1131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}