{"id":1723,"date":"2018-02-13T08:36:27","date_gmt":"2018-02-13T08:36:27","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=1723"},"modified":"2018-02-13T08:37:06","modified_gmt":"2018-02-13T08:37:06","slug":"ne-prag-te-pervjetorit-te-pavaresise-kek-rikthen-100-te-kapacitetit-prodhues-sipas-bilancit","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/ne-prag-te-pervjetorit-te-pavaresise-kek-rikthen-100-te-kapacitetit-prodhues-sipas-bilancit\/","title":{"rendered":"N\u00eb prag t\u00eb p\u00ebrvjetorit t\u00eb pavar\u00ebsis\u00eb, KEK rikthen 100 % t\u00eb kapacitetit prodhues sipas bilancit"},"content":{"rendered":"<p>Korporata Energjetike e Kosov\u00ebs (KEK) ka kthyer n\u00eb prodhim edhe \u201cBllokun A5\u201d t\u00eb Termocentralit \u201cKosova A\u201d.<br \/>\n<\/br><\/br><br \/>\nAktualisht Korporata \u00ebsht\u00eb duke operuar me 100 % t\u00eb kapaciteteve prodhuese t\u00eb energjis\u00eb elektrike sipas Bilancit energjetik t\u00eb aprovuar nga MZHE.<br \/>\n<\/br><\/br><br \/>\nAshtu si\u00e7 \u00ebsht\u00eb premtuar nga fillimi, edhe n\u00eb takimet me kryeministrin e vendit, z. Ramush Haradinaj dhe zyrtar\u00ebt tjer\u00eb t\u00eb institucioneve, t\u00eb gjitha parashikimet jan\u00eb realizuar n\u00eb nj\u00eb afat rekord pas arritjes s\u00eb marr\u00ebveshjes dhe zhbllokimit t\u00eb procesit t\u00eb zhvendosjes s\u00eb banor\u00ebve nga zonat e Had\u00ebs dhe Shipitull\u00ebs.<br \/>\n<\/br><\/br><br \/>\nT\u00eb gjith\u00eb pun\u00ebtor\u00ebt e KEK-ut, nga menaxhmenti, pun\u00ebtor\u00ebt e termocentraleve dhe ata t\u00eb mihjeve kan\u00eb punuar intensivisht q\u00eb t\u00eb arrihet nj\u00eb stabilitet maksimal dhe t\u00eb kthehen n\u00eb funksion t\u00eb gjitha nj\u00ebsit prodhuese para dit\u00ebve t\u00eb festave t\u00eb 10 vjetorit t\u00eb shpalljes s\u00eb Pavar\u00ebsis\u00eb s\u00eb Kosov\u00ebs.<br \/>\n<\/br><\/br><br \/>\nPo ashtu edhe t\u00eb gjitha nj\u00ebsit\u00eb gjeneruese n\u00eb terren, n\u00eb mihje jan\u00eb duke punuar me nj\u00eb dinamik dhe intensitet t\u00eb shtuar p\u00ebr t\u00eb kompensuar rezervat e shpenzuara gjat\u00eb koh\u00ebs sa kishte bllokad\u00eb si pasoj e vonesave n\u00eb shpron\u00ebsime.<br \/>\n<\/br><\/br><br \/>\nVar\u00ebsisht nga konsumi n\u00eb vend dhe k\u00ebrkesat nga operatoret n\u00eb treg, KEK-u ka n\u00eb dispozicion kapacitete prodhuese t\u00eb energjis\u00eb deri n\u00eb 780 MW\/h.<br \/>\n<\/br><\/br><br \/>\nBordi, Menaxhmenti dhe gjith\u00eb pun\u00ebtor\u00ebt e Korporat\u00ebs, me k\u00ebt\u00eb rast urojn\u00eb t\u00eb gjith\u00eb qytetar\u00ebt e vendit p\u00ebr Fest\u00ebn e madhe, jubilare t\u00eb 10 Vjetorit t\u00eb Pavar\u00ebsis\u00eb s\u00eb Kosov\u00ebs.<br \/>\n<\/br><\/br><br \/>\nUrime!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Korporata Energjetike e Kosov\u00ebs (KEK) ka kthyer n\u00eb prodhim edhe \u201cBllokun A5\u201d t\u00eb Termocentralit \u201cKosova A\u201d. Aktualisht Korporata \u00ebsht\u00eb duke operuar me 100 % t\u00eb kapaciteteve prodhuese t\u00eb energjis\u00eb elektrike sipas Bilancit energjetik t\u00eb aprovuar nga MZHE. Ashtu si\u00e7 \u00ebsht\u00eb premtuar nga fillimi, edhe n\u00eb takimet me kryeministrin e vendit, z. Ramush Haradinaj dhe zyrtar\u00ebt&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1391,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-1723","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/1723","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=1723"}],"version-history":[{"count":1,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/1723\/revisions"}],"predecessor-version":[{"id":1724,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/1723\/revisions\/1724"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media\/1391"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=1723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=1723"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=1723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}