{"id":1858,"date":"2018-09-12T14:12:11","date_gmt":"2018-09-12T14:12:11","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=1858"},"modified":"2018-09-12T14:17:33","modified_gmt":"2018-09-12T14:17:33","slug":"ambasada-amerikane-vlereson-punen-e-kek-ut","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/ambasada-amerikane-vlereson-punen-e-kek-ut\/","title":{"rendered":"Ambasada Amerikane vler\u00ebson pun\u00ebn e KEK-ut"},"content":{"rendered":"<p>Nj\u00eb delegacion i lart\u00eb nga Ambasada Amerikane n\u00eb Prishtin\u00eb n\u00eb krye me znj. Jessica Long, udh\u00ebheq\u00ebse e Sektorit Ekonomik dhe Politik dhe znj. Lori Michaelson, udh\u00ebheq\u00ebse e Nj\u00ebsis\u00eb Ekonomike, kan\u00eb vizituar Korporat\u00ebn Energjetike t\u00eb Kosov\u00ebs. <\/br><\/br><br \/>\nDrejtori Menaxhues i KEK-ut, Njazi Tha\u00e7i i ka informuar znj. Long dhe znj. Michaelson p\u00ebr gjendjen aktuale n\u00eb Korporat\u00eb, rezultatet e arritura, si dhe sfidat dhe proceset n\u00ebp\u00ebr t\u00eb cilat po kalon KEK-u, e me theks t\u00eb ve\u00e7ant\u00eb p\u00ebr zhvillimet e fundit rreth zgjerimit t\u00eb minierave t\u00eb reja dhe procesin e shpron\u00ebsimeve. <\/br><\/br><br \/>\nGjithashtu edhe p\u00ebr kapacitetet prodhuese dhe strategjit\u00eb e KEK-ut n\u00eb gjenerim t\u00eb th\u00ebngjillit dhe prodhim t\u00eb energjis\u00eb elektrike.<br \/>\nGjat\u00eb vizit\u00ebs n\u00eb Termocentralet \u201cKosov\u00ebn A\u201d dhe \u201cKosova B\u201d p\u00ebrfaq\u00ebsueset e Ambasad\u00ebs jan\u00eb njoftuar me pun\u00ebt t\u00eb cilat jan\u00eb duke u b\u00ebr\u00eb dhe rezultatet t\u00eb cilat jan\u00eb arritur n\u00eb stabilitetin e prodhimit t\u00eb energjis\u00eb p\u00ebrkund\u00ebr vjet\u00ebrsis\u00eb s\u00eb termocentraleve.<br \/>\n\u201cKEK-u n\u00eb vazhdim\u00ebsi ka performuar jasht\u00ebzakonisht mir\u00eb. Edhe krahasuar me statistikat e  vitit 1985 kur kan\u00eb qen\u00eb t\u00eb reja k\u00ebto blloqe nuk kan\u00eb qen\u00eb me stabile sesa tani. N\u00eb at\u00eb koh\u00eb kur kan\u00eb filluar pun\u00ebn, sipas statistikave kan\u00eb pasur diku rreth 100 r\u00ebnie t\u00eb pa planifikuara, nd\u00ebrsa sot n\u00eb vitin 2018 numri i r\u00ebnieve t\u00eb paplanifikuar nuk shkon mbi 30\u201d, ka th\u00ebn\u00eb Tha\u00e7i.<br \/>\nGjat\u00eb vizit\u00ebs n\u00eb miniera, u.d. Drejtori Menaxhues i ka njoftuar edhe me procesin e shpron\u00ebsimeve, zgjerimin e mihjeve t\u00eb reja dhe zhvendosjen. <\/br><\/br><br \/>\n\u201cSa i p\u00ebrket zhvendosjes, KEK-u ka zbatuar me p\u00ebrpik\u00ebri vendimin e qeverise dhe bazuar n\u00eb Planin e Veprimit t\u00eb Zhvendosjes kemi p\u00ebrfunduar me zhvendosje n\u00eb zon\u00ebn e pare e cila shtrihet n\u00eb 52 hek. Kan\u00eb mbetur edhe nj\u00eb apo dy prona t\u00eb pa shpron\u00ebsuara si pasoj\u00eb e disa kontesteve dhe ato shum\u00eb shpejt presim t\u2019i p\u00ebrfundojm\u00eb. Po ashtu aktualisht, jemi n\u00eb p\u00ebrfundim t\u00eb regjistrimit t\u00eb zon\u00ebs se dyt\u00eb e cila ka sip\u00ebrfaqe prej 122 hektareshit\u201d, ka potencuar Tha\u00e7i. <\/br><\/br><br \/>\nNga ana tjet\u00ebr, zyrtar\u00ebt e delegacionit t\u00eb Ambasad\u00ebs Amerikane n\u00eb Prishtin\u00eb theksuan se siguria e energjis\u00eb \u00ebsht\u00eb nj\u00eb problem i madh p\u00ebr Kosov\u00ebn, q\u00eb i kushton ekonomis\u00eb Kosovare m\u00eb shum\u00eb se 400 milion\u00eb dollar\u00eb n\u00eb vit. Ata vler\u00ebsuan p\u00ebrpjekjet e KEK-ut p\u00ebr t\u00eb p\u00ebrmir\u00ebsuar besueshm\u00ebrin\u00eb e termocentraleve dhe p\u00ebr t\u00eb siguruar furnizimin me th\u00ebngjill, dhe shtuan se marr\u00ebveshja e termocentralit Kosova e Re \u00ebsht\u00eb nj\u00eb hap i madh n\u00eb rrug\u00ebn e vendit drejt siguris\u00eb energjetike. <\/br><\/br><br \/>\nDuke fal\u00ebnderuar znj. Long dhe znj. Michaelson p\u00ebr interesimin e vazhduesh\u00ebm t\u00eb Ambasad\u00ebs Amerikane n\u00eb Prishtin\u00eb p\u00ebr sektorin e energjis\u00eb n\u00eb Kosov\u00eb, u.d. Drejtori Menaxhues i KEK-ut, Njazi Tha\u00e7i ka potencuar se KEK, \u00ebsht\u00eb duke p\u00ebrmbushur me p\u00ebrpik\u00ebri obligimet kontraktuale, si dhe \u00ebsht\u00eb n\u00eb p\u00ebrputhje t\u00eb plot\u00eb me rregullat e tregut n\u00eb fuqi. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nj\u00eb delegacion i lart\u00eb nga Ambasada Amerikane n\u00eb Prishtin\u00eb n\u00eb krye me znj. Jessica Long, udh\u00ebheq\u00ebse e Sektorit Ekonomik dhe Politik dhe znj. Lori Michaelson, udh\u00ebheq\u00ebse e Nj\u00ebsis\u00eb Ekonomike, kan\u00eb vizituar Korporat\u00ebn Energjetike t\u00eb Kosov\u00ebs. Drejtori Menaxhues i KEK-ut, Njazi Tha\u00e7i i ka informuar znj. Long dhe znj. Michaelson p\u00ebr gjendjen aktuale n\u00eb Korporat\u00eb, rezultatet&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1862,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-1858","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/1858","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=1858"}],"version-history":[{"count":1,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/1858\/revisions"}],"predecessor-version":[{"id":1860,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/1858\/revisions\/1860"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media\/1862"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=1858"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=1858"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=1858"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}