{"id":2362,"date":"2020-06-29T06:53:03","date_gmt":"2020-06-29T06:53:03","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=2362"},"modified":"2020-06-29T06:56:01","modified_gmt":"2020-06-29T06:56:01","slug":"kek-u-sqaron-rreth-keq-informimit-lidhur-me-angazhimin-e-kompanise-alstom-ne-kek","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/kek-u-sqaron-rreth-keq-informimit-lidhur-me-angazhimin-e-kompanise-alstom-ne-kek\/","title":{"rendered":"KEK-u sqaron rreth keq informimit lidhur me  angazhimin e kompanis\u00eb \u201cALSTOM\u201d n\u00eb KEK"},"content":{"rendered":"<p>Duke qen\u00eb se dit\u00ebve t\u00eb fundit disa zyrtar\u00eb t\u00eb KEK-ut, n\u00eb m\u00ebnyr\u00eb t\u00eb q\u00ebllimshme, duke dashur t\u00eb d\u00ebmtojn\u00eb imazhin e KEK-ut, kan\u00eb v\u00ebn\u00eb n\u00eb lajthitje disa media duke i dezinformuar ata dhe p\u00ebrmes tyre edhe opinionin e gjer\u00eb publik, KEK-u sqaron si n\u00eb vijim.<\/br><br \/>\nP\u00ebr hire t\u00eb informimit t\u00eb opinionit t\u00eb gjer\u00eb dhe p\u00ebr hire t\u00eb transparenc\u00ebs, Korporata Energjetike e Kosov\u00ebs njofton se \u2018ALSTOM\u2019 \u00ebsht\u00eb prezente n\u00eb Kosov\u00eb n\u00eb vazhdim\u00ebsi q\u00eb nga viti 1979 pasi q\u00eb \u00ebsht\u00eb kompani projektuese e Termocentralit Kosova B, nd\u00ebrsa n\u00eb var\u00ebsi t\u00eb marr\u00ebveshjeve kontraktuale n\u00eb TC-B gjendet q\u00eb nga viti 1983\/4, nga kur ky termocentral \u00ebsht\u00eb l\u00ebshuar n\u00eb pun\u00eb.<\/br><br \/>\nN\u00eb k\u00ebt\u00eb drejtim, ju b\u00ebjm\u00eb me dije se edhe nga koha e pas luftes, respektivisht nga viti 1999 \u2013 2006, kompania \u201cALSTOM\u201d ka vazhduar prezenc\u00ebn e saj  n\u00eb TC-B (gjat\u00eb menaxhimit dhe investimeve nga nd\u00ebrkomb\u00ebtar\u00ebt) me kontrata nga BE-AER. Madje pas zjarrit n\u00eb nj\u00eb pjes\u00eb t\u00eb madhe t\u00eb k\u00ebtij termocentrali qe ndodhi ne vitin 2002, kjo kompani ka b\u00ebr\u00eb riparimet gjenerale n\u00eb TC-B, me kontrat\u00ebn (nga BE-AER) p\u00ebr riparimin e d\u00ebmeve t\u00eb zjarrit (Fire Damage Repair &#8211; FDR) <\/br><br \/>\nP\u00ebr m\u00eb tep\u00ebr, kompania \u201cALSTOM\u201d \u00ebsht\u00eb prodhuesi origjinal i pajisjeve kryesore n\u00eb TC Kosova B, me theks t\u00eb ve\u00e7ant\u00eb n\u00eb turbin\u00eb, gjenerator dhe sistemin e monitorimit dhe kontrollit (DCS) t\u00eb komplet termocentralit Kosova B.  KEK-u q\u00eb nga nd\u00ebrtimi i TC B-s\u00eb, p\u00ebr shkak t\u00eb drejt\u00ebs autoriale t\u00eb prodhuesit ka qen\u00eb e detyruar t\u00eb kontraktoj kompanin\u00eb \u201cALSTOM\u201d p\u00ebr blerje \u2013 riparim por edhe instalim t\u00eb k\u00ebtyre pajisjeve kritike n\u00eb kuad\u00ebr t\u00eb TC B-s\u00eb. Prandaj, p\u00ebr shkak t\u00eb kufizimit t\u00eb s\u00eb drejt\u00ebs autoriale t\u00eb prodhuesit na e pamund\u00ebson kontraktimin e k\u00ebtyre sh\u00ebrbimeve\/furnizimeve me prodhues t\u00eb tjer\u00eb p\u00ebr pajisje t\u00eb TC B-s\u00eb. Pra kompania \u201cALSTOM\u201d, si projektuese e TC-B-s\u00eb ka qen\u00eb e p\u00ebrfshir\u00eb n\u00eb t\u00eb gjitha proceset e k\u00ebtij termocentrali q\u00eb nga themelimi dhe vazhdon t\u00eb jet\u00eb edhe sot.<\/br><br \/>\nVlen t\u00eb theksohet se t\u00eb gjitha kontraktimet e deritanishme me kompanin\u00eb \u201cALSTOM\u201d jan\u00eb zhvilluar n\u00eb harmoni t\u00eb plot\u00eb me LPP. N\u00eb k\u00ebt\u00eb drejtim, sa i p\u00ebrket kontratave mes KEK dhe \u201cALSTOM\u201d, ne jemi t\u00eb gatsh\u00ebm tu ofrojm\u00eb transparenc\u00eb t\u00eb plot\u00eb n\u00eb t\u00eb gjitha kontratat q\u00eb ekzistojn\u00eb n\u00eb arkivat e korporat\u00ebs, gjithnj\u00eb duke respektuar ligjin p\u00ebr qasje n\u00eb dokumentet zyrtare.<\/br><br \/>\nFare n\u00eb fund, Korporata Energjetike e Kosov\u00ebs, duke qen\u00eb e bindur se k\u00ebto shpifje nga zyrtar\u00eb t\u00eb caktuar t\u00eb KEK-ut, pik\u00ebrisht pas 40 vite bashk\u00ebpunimi n\u00eb mes t\u00eb KEK-ut dhe partnerit strategjik \u201cALSTOM\u201d jan\u00eb t\u00eb q\u00ebllimshme dhe po dezinformojn\u00eb opinionin e gjer\u00eb publik, s\u00eb shpejti do t\u00eb filloj\u00eb me marrjen e masave adekuate administrative konform rregulloreve t\u00eb brendshme dhe legjislacionit n\u00eb fuqi duke p\u00ebrfshir\u00eb edhe organet relevante t\u00eb drejt\u00ebsis\u00eb. E gjith\u00eb kjo me q\u00ebllim t\u00eb transparenc\u00ebs dhe mbrojtjes s\u00eb imazhit t\u00eb KEK-ut.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Duke qen\u00eb se dit\u00ebve t\u00eb fundit disa zyrtar\u00eb t\u00eb KEK-ut, n\u00eb m\u00ebnyr\u00eb t\u00eb q\u00ebllimshme, duke dashur t\u00eb d\u00ebmtojn\u00eb imazhin e KEK-ut, kan\u00eb v\u00ebn\u00eb n\u00eb lajthitje disa media duke i dezinformuar ata dhe p\u00ebrmes tyre edhe opinionin e gjer\u00eb publik, KEK-u sqaron si n\u00eb vijim. P\u00ebr hire t\u00eb informimit t\u00eb opinionit t\u00eb gjer\u00eb dhe p\u00ebr hire&#8230;<\/p>\n","protected":false},"author":1,"featured_media":351,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-2362","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/2362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=2362"}],"version-history":[{"count":1,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/2362\/revisions"}],"predecessor-version":[{"id":2363,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/2362\/revisions\/2363"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media\/351"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=2362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=2362"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=2362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}