{"id":2496,"date":"2021-08-19T06:51:33","date_gmt":"2021-08-19T06:51:33","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=2496"},"modified":"2021-08-19T16:18:57","modified_gmt":"2021-08-19T16:18:57","slug":"bpd-merr-vendime-te-rendesishme-per-zhvillimin-strategjik-te-korporates","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/bpd-merr-vendime-te-rendesishme-per-zhvillimin-strategjik-te-korporates\/","title":{"rendered":"BPD merr vendime t\u00eb r\u00ebnd\u00ebsishme p\u00ebr zhvillimin strategjik t\u00eb korporat\u00ebs"},"content":{"rendered":"<p>\nBordi i P\u00ebrkohsh\u00ebm i Drejtor\u00ebve (BPD) t\u00eb Korporat\u00ebs Energjetike t\u00eb Kosov\u00ebs (KEK) n\u00eb mbledhjen e rregullt t\u00eb mbajtur dje, me dat\u00eb 17 Gusht 2021, duke pas si objektiv\u00eb ngritjen e performanc\u00ebs, sigurin\u00eb e operimeve n\u00eb nj\u00ebsit\u00eb prodhuese dhe inovacionin p\u00ebr t\u00eb ardhmen, konform kompetencave dhe p\u00ebrgjegj\u00ebsive q\u00eb ka si p\u00ebrfaq\u00ebsues i aksionarit ka marr\u00eb disa vendime t\u00eb r\u00ebnd\u00ebsis\u00eb s\u00eb ve\u00e7ant\u00eb p\u00ebr zhvillimin strategjik t\u00eb korporat\u00ebs.<br \/>\nVendimet e BPD-s\u00eb jan\u00eb si n\u00eb vijim:<\/br><\/br><\/p>\n<p>\u27a2 P\u00ebr p\u00ebrgatitjen e draft dokumentit teknik lidhur me Termocentralin  Kosova A, respektivisht p\u00ebrgatitjen e draft letr\u00ebs p\u00ebr shprehjen e interesit lidhur me rind\u00ebrtimin e saj, q\u00eb do ti prezantohen aksionarit p\u00ebr vler\u00ebsim dhe vendimmarrje. Ky vendim \u00ebsht\u00eb marr\u00eb duke e pasur parasysh vjet\u00ebrsin\u00eb e Termocentralit A q\u00eb nd\u00ebrlidhet ngusht\u00eb me sigurin\u00eb e pun\u00ebtor\u00ebve, sigurimin e q\u00ebndruesh\u00ebm me energji eletrike dhe investimet vjetore t\u00eb m\u00ebdha p\u00ebr mir\u00ebmbajtje.<\/br><\/p>\n<p>\u27a2 P\u00ebr vazhdimi i procedur\u00ebs p\u00ebr vler\u00ebsimin e rrezikshm\u00ebris\u00eb s\u00eb vendeve t\u00eb pun\u00ebs,<\/br><\/p>\n<p>\u27a2 P\u00ebr fillimin e procedur\u00ebs p\u00ebr zhvillimin e infrastruktur\u00ebs p\u00ebr projektin e parkut solar dhe energjis\u00eb se rip\u00ebrt\u00ebritshme.<\/br><\/p>\n<p>\u27a2 Vazhdimin e zgjerimit t\u00eb zonave t\u00eb gjelb\u00ebrimit rreth zon\u00ebs s\u00eb KEK-sha, ne interes t\u00eb komunitetit dhe ambientit,<\/br><\/p>\n<p>\u27a2 Identifikimin e nevojave p\u00ebr staf deficitar  dhe t\u00eb domosdosh\u00ebm, dhe vazhdimin e procedurave t\u00eb regrutimit  konform ligjit,<\/br><\/p>\n<p>\u27a2 Vazhdimin e procedurave t\u00eb p\u00ebrkrahjes s\u00eb kuadrove t\u00eb reja dhe deficitare p\u00ebrmes bursave dhe internship p\u00ebr student,<\/br><\/p>\n<p>\u27a2 Funksionalizimin e pun\u00ebs s\u00eb mens\u00ebs n\u00eb TCB, si dhe renovimin e funksionalizimin e mensave t\u00eb tjera si dhe ngritjen e kualitetit dhe cil\u00ebsis\u00eb se ushqimit,<\/br><\/p>\n<p>\u27a2 Vazhdimin e auditimit t\u00eb kontratave t\u00eb mesme dhe t\u00eb m\u00ebdha nga ana e auditimit t\u00eb brendsh\u00ebm nga periudha e inicimit t\u00eb k\u00ebrkesave deri n\u00eb implementimin e tyre,<\/br><\/p>\n<p>\u27a2 Inicimin e procedurave disiplinore nga ana e menaxhmentit,  n\u00eb pajtim me procedur\u00ebn, p\u00ebr t\u00eb gjitha shkeljet e evidentuara,<\/br><\/p>\n<p>\u27a2 Drejtoria e nj\u00ebsis\u00eb qendrore p\u00ebr planifikim dhe strategjik i KEK-sha t\u00eb riem\u00ebrohet n\u00eb Drejtoria p\u00ebr zhvillim strategjik dhe energji t\u00eb rip\u00ebrtritshme, dhe n\u00eb kuad\u00ebr t\u00eb saj t\u00eb merret me studimin dhe zhvillimin e energjis\u00eb solare dhe nga burime tjera t\u00eb rip\u00ebrtritshme.<\/br><\/p>\n<p>\u27a2 Vazhdimin e procedurave t\u00eb identifikimit t\u00eb pronave t\u00eb KEK-sha dhe vazhdimin e pun\u00ebs s\u00eb task forc\u00ebs p\u00ebr k\u00ebt\u00eb q\u00ebllim dhe raportimi periodik nga ana e tyre.<\/br><\/br><\/p>\n<p>Bordi m\u00eb k\u00ebt\u00eb rast vazhdon ti inkurajon pun\u00ebtor\u00ebt p\u00ebr vaksinim, si dhe  menaxhmentin p\u00ebr p\u00ebrmir\u00ebsimin dhe sigurimin e kushteve t\u00eb pun\u00ebs n\u00eb pajtim t\u00eb plot\u00eb me k\u00ebrkesat ligjore dhe procedurat n\u00eb fuqi.<\/br><\/br><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2021\/08\/Vendimi-i-BPD-519x1024.jpg\" alt=\"\" width=\"519\" height=\"1024\" class=\"alignleft size-large wp-image-2509\" srcset=\"http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2021\/08\/Vendimi-i-BPD-519x1024.jpg 519w, http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2021\/08\/Vendimi-i-BPD-152x300.jpg 152w, http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2021\/08\/Vendimi-i-BPD-768x1515.jpg 768w, http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2021\/08\/Vendimi-i-BPD.jpg 954w\" sizes=\"auto, (max-width: 519px) 100vw, 519px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bordi i P\u00ebrkohsh\u00ebm i Drejtor\u00ebve (BPD) t\u00eb Korporat\u00ebs Energjetike t\u00eb Kosov\u00ebs (KEK) n\u00eb mbledhjen e rregullt t\u00eb mbajtur dje, me dat\u00eb 17 Gusht 2021, duke pas si objektiv\u00eb ngritjen e performanc\u00ebs, sigurin\u00eb e operimeve n\u00eb nj\u00ebsit\u00eb prodhuese dhe inovacionin p\u00ebr t\u00eb ardhmen, konform kompetencave dhe p\u00ebrgjegj\u00ebsive q\u00eb ka si p\u00ebrfaq\u00ebsues i aksionarit ka marr\u00eb disa&#8230;<\/p>\n","protected":false},"author":1,"featured_media":468,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2496","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/2496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=2496"}],"version-history":[{"count":13,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/2496\/revisions"}],"predecessor-version":[{"id":2510,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/2496\/revisions\/2510"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media\/468"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=2496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=2496"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=2496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}