{"id":4286,"date":"2025-07-04T10:37:36","date_gmt":"2025-07-04T08:37:36","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=4286"},"modified":"2025-07-08T14:45:14","modified_gmt":"2025-07-08T12:45:14","slug":"njoftim-per-opinionin","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/njoftim-per-opinionin\/","title":{"rendered":"Projekti A3 nuk \u00ebsht\u00eb anuluar"},"content":{"rendered":"<p><strong>Mos bini pre e dezinformatave \u2013 Projekti A3 nuk \u00ebsht\u00eb anuluar!<\/strong> <\/br><\/p>\n<p>Prishtin\u00eb, 04.07.2025 &#8211; Korporata Energjetike e Kosov\u00ebs (KEK Sh.A.) njofton qytetar\u00ebt se projekti kapital \u201cRehabilitimi dhe Modernizimi i Nj\u00ebsis\u00eb A3 n\u00eb Termocentralin Kosova A\u201d nuk \u00ebsht\u00eb anuluar, por \u00ebsht\u00eb pezulluar p\u00ebrkoh\u00ebsisht, si rezultat i nj\u00eb ankese t\u00eb paraqitur nga nj\u00eb operator ekonomik n\u00eb Organin Shqyrtues t\u00eb Prokurimit (OSHP).<\/br><br \/>\nD\u00ebshirojm\u00eb t\u00eb theksojm\u00eb qart\u00eb se, n\u00eb p\u00ebrputhje me Ligjin p\u00ebr Prokurimin Publik (LPP), \u00e7do ankes\u00eb e dor\u00ebzuar n\u00eb OSHP pezullon automatikisht procedur\u00ebn p\u00ebrkat\u00ebse deri n\u00eb marrjen e nj\u00eb vendimi zyrtar. Ky \u00ebsht\u00eb nj\u00eb mekaniz\u00ebm standard ligjor, i aplikuesh\u00ebm p\u00ebr t\u00eb gjitha institucionet publike, dhe nuk p\u00ebrb\u00ebn as rastin e par\u00eb, as t\u00eb fundit t\u00eb pezullimit t\u00eb p\u00ebrkohsh\u00ebm t\u00eb nj\u00eb aktiviteti p\u00ebr arsye procedurale. Lidhur me k\u00ebt\u00eb, Zyrtari i Prokurimit (ZEP) m\u00eb dat\u00eb: 02.07.2025 ka dor\u00ebzuar n\u00eb OSHP k\u00ebrkes\u00ebn p\u00ebr heqjen e obligimit p\u00ebr pezullim sipas nenit 112 paragrafi 2. LPP. <\/br> <\/p>\n<p>KEK \u00ebsht\u00eb e bindur se ankesa n\u00eb fjal\u00eb \u00ebsht\u00eb e pabazuar dhe ka k\u00ebrkuar nga OSHP q\u00eb ta trajtoj\u00eb rastin me prioritet t\u00eb lart\u00eb, duke pasur parasysh r\u00ebnd\u00ebsin\u00eb strategjike t\u00eb k\u00ebtij projekti p\u00ebr sektorin energjetik dhe sigurin\u00eb energjetike t\u00eb vendit. Kjo bindje \u00ebsht\u00eb mb\u00ebshtetur edhe nga raporti zyrtar i p\u00ebrpiluar nga Eksperti Shqyrtues i OSHP-s\u00eb (nr. l\u00ebnd\u00ebs 2025\/0579), i cili rekomandon Panelin Shqyrtues q\u00eb ankesa e operatorit ekonomik ankues t\u00eb refuzohet si e palejuar.<\/br><br \/>\nKorporata rithekson p\u00ebrkushtimin e saj q\u00eb i gjith\u00eb procesi t\u00eb zhvillohet n\u00eb m\u00ebnyr\u00eb transparente dhe t\u00eb drejt\u00eb, me konkurrenc\u00eb t\u00eb hapur, n\u00eb p\u00ebrputhje t\u00eb plot\u00eb me Ligjin p\u00ebr Prokurimin Publik dhe me dokumentacionin e p\u00ebrgatitur nga ekspert\u00ebt profesionist\u00eb t\u00eb KEK-ut, n\u00eb bashk\u00ebpunim me konsulenc\u00ebn e USAID, e cila ka dh\u00ebn\u00eb nj\u00eb kontribut t\u00eb \u00e7muar n\u00eb hartimin profesional t\u00eb dokumenteve, sipas standardeve m\u00eb t\u00eb mira nd\u00ebrkomb\u00ebtare dhe bazuar n\u00eb legjislacionin n\u00eb fuqi.<\/br><br \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2025\/07\/ALI_6750-2-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" class=\"aligncenter size-medium wp-image-4295\" srcset=\"http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2025\/07\/ALI_6750-2-300x200.jpg 300w, http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2025\/07\/ALI_6750-2-380x252.jpg 380w, http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2025\/07\/ALI_6750-2.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/> <\/br><br \/>\nKEK \u00ebsht\u00eb i p\u00ebrkushtuar q\u00eb me vendosm\u00ebri ta \u00e7oj\u00eb p\u00ebrpara k\u00ebt\u00eb projekt deri n\u00eb finalizimin e tij, pa marr\u00eb parasysh \u00e7do tendenc\u00eb p\u00ebr t\u00eb cenuar integritetin e procesit p\u00ebrmes dezinformatave apo pretendimeve t\u00eb pabazuara.<\/br><\/p>\n<p>Prandaj, k\u00ebrkojm\u00eb nga t\u00eb gjitha pal\u00ebt q\u00eb t\u00eb shmangin p\u00ebrhapjen e dezinformatave dhe t\u00eb kontribuojn\u00eb n\u00eb nj\u00eb debat t\u00eb drejt\u00eb, t\u00eb bazuar n\u00eb fakte, transparenc\u00eb dhe ligjshm\u00ebri.  <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2025\/07\/DJI_0108-1-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" class=\"aligncenter size-medium wp-image-4296\" srcset=\"http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2025\/07\/DJI_0108-1-300x169.jpg 300w, http:\/\/kek-energy.com\/kek\/permbajtja\/uploads\/2025\/07\/DJI_0108-1.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mos bini pre e dezinformatave \u2013 Projekti A3 nuk \u00ebsht\u00eb anuluar! Prishtin\u00eb, 04.07.2025 &#8211; Korporata Energjetike e Kosov\u00ebs (KEK Sh.A.) njofton qytetar\u00ebt se projekti kapital \u201cRehabilitimi dhe Modernizimi i Nj\u00ebsis\u00eb A3 n\u00eb Termocentralin Kosova A\u201d nuk \u00ebsht\u00eb anuluar, por \u00ebsht\u00eb pezulluar p\u00ebrkoh\u00ebsisht, si rezultat i nj\u00eb ankese t\u00eb paraqitur nga nj\u00eb operator ekonomik n\u00eb Organin&#8230;<\/p>\n","protected":false},"author":1,"featured_media":4287,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-4286","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/4286","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=4286"}],"version-history":[{"count":9,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/4286\/revisions"}],"predecessor-version":[{"id":4304,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/4286\/revisions\/4304"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media\/4287"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=4286"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=4286"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=4286"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}