{"id":4333,"date":"2025-07-14T13:11:22","date_gmt":"2025-07-14T11:11:22","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=4333"},"modified":"2025-07-14T13:12:47","modified_gmt":"2025-07-14T11:12:47","slug":"projekti-a3-vazhdon","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/projekti-a3-vazhdon\/","title":{"rendered":"Projekti A3 VAZHDON!"},"content":{"rendered":"<p> Korporata Energjetike e Kosov\u00ebs (KEK Sh.A.) njofton opinionin publik se projekti kapital \u201cRehabilitimi dhe Modernizimi i Nj\u00ebsis\u00eb A3\u201d n\u00eb Termocentralin Kosova A vazhdon, n\u00eb p\u00ebrputhje t\u00eb plot\u00eb me ligjin dhe me vendosm\u00ebrin\u00eb e pandryshuar t\u00eb KEK-ut p\u00ebr ta \u00e7uar p\u00ebrpara k\u00ebt\u00eb investim strategjik p\u00ebr sektorin energjetik t\u00eb Kosov\u00ebs.<\/br><br \/>\nKy projekt, i cili ishte pezulluar p\u00ebrkoh\u00ebsisht p\u00ebr shkak t\u00eb nj\u00eb ankese t\u00eb paraqitur nga nj\u00eb Operator Ekonomik n\u00eb OSHP, ka marr\u00eb tashm\u00eb drit\u00ebn e gjelb\u00ebr p\u00ebr t\u00eb vijuar. M\u00eb dat\u00eb 10.07.2025, Organi Shqyrtues i Prokurimit (OSHP) ka hedhur si t\u00eb palejuar ankes\u00ebn e operatorit ankues dhe ripohoi ligjshm\u00ebrin\u00eb dhe korrekt\u00ebsin\u00eb e plot\u00eb t\u00eb veprimeve t\u00eb nd\u00ebrmarra nga KEK, duke autorizuar vazhdimin e aktivitetit t\u00eb prokurimit me nr. KEK-25-58-5-1-4.<\/br><br \/>\nKorporata rithekson angazhimin e saj t\u00eb pal\u00ebkundur q\u00eb i gjith\u00eb procesi t\u00eb zhvillohet me transparenc\u00eb t\u00eb plot\u00eb, integritet dhe profesionaliz\u00ebm, n\u00eb p\u00ebrputhje me standardet m\u00eb t\u00eb larta t\u00eb prokurimit publik dhe me dokumentacionin e p\u00ebrgatitur n\u00eb bashk\u00ebpunim me ekspert\u00ebt vendor\u00eb dhe konsulenc\u00ebn e USAID.<br \/>\nN\u00eb k\u00ebt\u00eb frym\u00eb transparence dhe p\u00ebrgjegjshm\u00ebrie publike, <strong>KEK njofton se t\u00eb enjten, m\u00eb 17.07.2025, duke filluar nga ora 13:00, n\u00eb sall\u00ebn e takimeve n\u00eb TC Kosova B, planifikohet t\u00eb b\u00ebhet hapja zyrtare e aplikimeve t\u00eb Operator\u00ebve Ekonomik\u00eb, p\u00ebrmes platform\u00ebs elektronike t\u00eb e-prokurimit.<\/strong> Kjo ngjarje do t\u00eb transmetohet drejtp\u00ebrdrejt n\u00eb rrjetin social zyrtar t\u00eb KEK Sh.A., n\u00eb m\u00ebnyr\u00eb q\u00eb \u00e7do qytetar dhe pal\u00eb e interesuar t\u00eb ket\u00eb qasje t\u00eb drejtp\u00ebrdrejt\u00eb n\u00eb rrjedh\u00ebn e procesit.<\/br><br \/>\nKEK mbetet i vendosur q\u00eb k\u00ebt\u00eb projekt jetik ta \u00e7oj\u00eb deri n\u00eb fund, duke garantuar konkurrenc\u00eb t\u00eb ndershme, transparenc\u00eb t\u00eb mir\u00ebfillt\u00eb, zbatim t\u00eb ligjit dhe p\u00ebrkushtim maksimal p\u00ebr t\u00eb ardhmen energjetike t\u00eb vendit.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Korporata Energjetike e Kosov\u00ebs (KEK Sh.A.) njofton opinionin publik se projekti kapital \u201cRehabilitimi dhe Modernizimi i Nj\u00ebsis\u00eb A3\u201d n\u00eb Termocentralin Kosova A vazhdon, n\u00eb p\u00ebrputhje t\u00eb plot\u00eb me ligjin dhe me vendosm\u00ebrin\u00eb e pandryshuar t\u00eb KEK-ut p\u00ebr ta \u00e7uar p\u00ebrpara k\u00ebt\u00eb investim strategjik p\u00ebr sektorin energjetik t\u00eb Kosov\u00ebs. Ky projekt, i cili ishte pezulluar p\u00ebrkoh\u00ebsisht&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2257,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-4333","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/4333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=4333"}],"version-history":[{"count":1,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/4333\/revisions"}],"predecessor-version":[{"id":4334,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/4333\/revisions\/4334"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media\/2257"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=4333"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=4333"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=4333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}