{"id":4813,"date":"2025-11-12T22:53:33","date_gmt":"2025-11-12T21:53:33","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=4813"},"modified":"2025-11-14T11:04:31","modified_gmt":"2025-11-14T10:04:31","slug":"njoftim-per-projektin-rehabilitimi-dhe-modernizimi-i-njesise-a3-ne-tc-kosova-a","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/njoftim-per-projektin-rehabilitimi-dhe-modernizimi-i-njesise-a3-ne-tc-kosova-a\/","title":{"rendered":"Njoftim p\u00ebr projektin &#8211; Rehabilitimi dhe modernizimi i nj\u00ebsis\u00eb A3 n\u00eb TC Kosova A"},"content":{"rendered":"<p>Projekti: Rehabilitimi dhe modernizimi i nj\u00ebsis\u00eb A3 n\u00eb TC Kosova A <\/br><br \/>\nNr. i prokurimit: KEK-25-58-5-1-4<\/br><br \/>\nNr. i brendsh\u00ebm: KEKC-25-003-514<\/br><br \/>\nN\u00eb kuad\u00ebr t\u00eb transparenc\u00ebs institucionale dhe informimit t\u00eb opinionit publik p\u00ebr projektet strategjike t\u00eb Korporat\u00ebs Energjetike t\u00eb Kosov\u00ebs (KEK), njoftojm\u00eb se \u00ebsht\u00eb zhvilluar me sukses faza e par\u00eb e aktivitetit t\u00eb prokurimit p\u00ebr projektin madhor \u201cRehabilitimi dhe modernizimi i nj\u00ebsis\u00eb A3 n\u00eb TC Kosova A\u201d.<br \/>\nKy projekt p\u00ebrb\u00ebn nj\u00eb nga investimet m\u00eb t\u00eb r\u00ebnd\u00ebsishme n\u00eb sektorin energjetik t\u00eb vendit, me ndikim t\u00eb drejtp\u00ebrdrejt\u00eb n\u00eb rritjen e siguris\u00eb s\u00eb furnizimit me energji elektrike dhe zgjatjen e jet\u00ebs operacionale t\u00eb nj\u00ebsis\u00eb prodhuese A3 t\u00eb Termocentralit \u201cKosova A\u201d.<\/br><br \/>\n<strong>Zhvillimi i aktivitetit t\u00eb prokurimit<\/strong> <\/br><br \/>\nAktiviteti \u00ebsht\u00eb publikuar m\u00eb 23.01.2025, p\u00ebrmes procedur\u00ebs konkurruese me negociata, nd\u00ebrsa afati fillestar p\u00ebr dor\u00ebzimin e aplikacioneve ka qen\u00eb 03.03.2025.<\/br><br \/>\nDuke marr\u00eb parasysh r\u00ebnd\u00ebsin\u00eb e projektit dhe k\u00ebrkesat shtes\u00eb t\u00eb operator\u00ebve ekonomik\u00eb, afati \u00ebsht\u00eb shtyr\u00eb kat\u00ebr her\u00eb, deri m\u00eb 04.07.2025.<\/br><br \/>\nM\u00eb 27.06.2025, nj\u00eb operator ekonomik ka dor\u00ebzuar k\u00ebrkes\u00eb p\u00ebr rishqyrtim, e cila \u00ebsht\u00eb refuzuar nga Autoriteti Kontraktues p\u00ebr munges\u00eb t\u00eb pretendimeve t\u00eb qarta ankimore.<\/br><br \/>\nM\u00eb pas, m\u00eb 01.07.2025, i nj\u00ebjti operator ka paraqitur ankes\u00eb n\u00eb OSHP, e cila, me vendim t\u00eb dat\u00ebs 10.07.2025, \u00ebsht\u00eb hedhur si e palejuar, duke i hapur rrug\u00eb vazhdimit t\u00eb procesit t\u00eb prokurimit.<br \/>\nAfati p\u00ebr dor\u00ebzim t\u00eb aplikacioneve \u00ebsht\u00eb caktuar m\u00eb 17.07.2025, ku jan\u00eb pranuar gjithsej pes\u00eb (5) aplikacione nga konsorciume me pjes\u00ebmarrje t\u00eb operator\u00ebve ekonomik\u00eb vendor\u00eb dhe nd\u00ebrkomb\u00ebtar\u00eb.<br \/>\nProcesi i hapjes s\u00eb aplikacioneve \u00ebsht\u00eb zhvilluar p\u00ebrmes transmetimit t\u00eb drejtp\u00ebrdrejt\u00eb, duke sh\u00ebnuar nj\u00eb standard t\u00eb ri t\u00eb transparenc\u00ebs dhe llogaridh\u00ebnies publike n\u00eb aktivitetet e prokurimit t\u00eb KEK sh.a.<\/br><br \/>\nR<strong>ezultatet e faz\u00ebs s\u00eb par\u00eb t\u00eb kualifikimit<\/strong> <\/br><br \/>\nPas vler\u00ebsimit t\u00eb dokumentacionit t\u00eb paraqitur, komisioni profesional vler\u00ebsues, nga pes\u00eb (5) konsorciume, ka p\u00ebrzgjedhur tre (3) konsorciume t\u00eb kualifikuara, si vijon:<\/br><br \/>\n<strong>Operator\u00ebt e kualifikuar:<\/strong><\/br><br \/>\n1.\tGrupi i operator\u00ebve ekonomik KEPCO Plant Service &#038; Engineering Co., LTD; DYPNF Co., Ltd.; BHI Co., Ltd., 211 Munhwa-ro, Naju-si, Jeollanam-do, Republika e Kores\u00eb<\/br><br \/>\n2.\tGrupi i operator\u00ebve ekonomik HIB PETROL SH.P.K.; Florian Viqa; NTPC Limited, Magjistralja Prishtin\u00eb\u2013Shkup, km 7, \u00c7agllavic\u00eb, Kosov\u00eb <\/br><br \/>\n3.\tLIMAK IN\u015eAAT SANAYI ve TICARET A.\u015e., Hafta Sokak No: 9, 06700, Gaziosman Pa\u015fa \u2013 Ankara, Turqi <\/br><br \/>\nM\u00eb 11.11.2025, Autoriteti Kontraktues \u2013 KEK sh.a., ka publikuar n\u00eb platform\u00ebn e-prokurimi njoftimin mbi vendimin e AK-s\u00eb lidhur me rezultatin e faz\u00ebs s\u00eb par\u00eb t\u00eb kualifikimit, duke p\u00ebrmbyllur me sukses k\u00ebt\u00eb faz\u00eb t\u00eb r\u00ebnd\u00ebsishme t\u00eb aktivitetit t\u00eb prokurimit.<\/br><br \/>\n<strong>P\u00ebrfundim<\/strong><\/br><br \/>\nKEK sh.a. thekson se i gjith\u00eb procesi \u00ebsht\u00eb zhvilluar n\u00eb p\u00ebrputhje t\u00eb plot\u00eb me Ligjin p\u00ebr Prokurimin Publik (LPP) dhe me Rregullat dhe Udh\u00ebzuesin Operativ p\u00ebr Prokurimin Publik (RRPP), duke garantuar transparenc\u00eb t\u00eb plot\u00eb, konkurrenc\u00eb t\u00eb ndershme dhe trajtim t\u00eb barabart\u00eb p\u00ebr t\u00eb gjith\u00eb operator\u00ebt ekonomik\u00eb pjes\u00ebmarr\u00ebs.<br \/>\nKorporata mbetet e p\u00ebrkushtuar t\u00eb vazhdoj\u00eb me profesionaliz\u00ebm, integritet dhe p\u00ebrgjegj\u00ebsi institucionale zhvillimin e projekteve strategjike q\u00eb kontribuojn\u00eb n\u00eb modernizimin e infrastruktur\u00ebs energjetike dhe n\u00eb forcimin e siguris\u00eb energjetike t\u00eb Republik\u00ebs s\u00eb Kosov\u00ebs.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Projekti: Rehabilitimi dhe modernizimi i nj\u00ebsis\u00eb A3 n\u00eb TC Kosova A Nr. i prokurimit: KEK-25-58-5-1-4 Nr. i brendsh\u00ebm: KEKC-25-003-514 N\u00eb kuad\u00ebr t\u00eb transparenc\u00ebs institucionale dhe informimit t\u00eb opinionit publik p\u00ebr projektet strategjike t\u00eb Korporat\u00ebs Energjetike t\u00eb Kosov\u00ebs (KEK), njoftojm\u00eb se \u00ebsht\u00eb zhvilluar me sukses faza e par\u00eb e aktivitetit t\u00eb prokurimit p\u00ebr projektin madhor \u201cRehabilitimi&#8230;<\/p>\n","protected":false},"author":1,"featured_media":4814,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-4813","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/4813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=4813"}],"version-history":[{"count":7,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/4813\/revisions"}],"predecessor-version":[{"id":4821,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/4813\/revisions\/4821"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media\/4814"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=4813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=4813"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=4813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}