{"id":5040,"date":"2026-04-01T09:02:23","date_gmt":"2026-04-01T07:02:23","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=5040"},"modified":"2026-04-02T09:10:45","modified_gmt":"2026-04-02T07:10:45","slug":"kek-sh-a-shenon-nje-hap-te-rendesishem-drejt-transformimit-mjedisor-nenshkruhet-kontrata-per-trajtimin-e-ujerave-shkarkuese-ne-tc-kosova-b","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/kek-sh-a-shenon-nje-hap-te-rendesishem-drejt-transformimit-mjedisor-nenshkruhet-kontrata-per-trajtimin-e-ujerave-shkarkuese-ne-tc-kosova-b\/","title":{"rendered":"KEK sh.a. sh\u00ebnon nj\u00eb hap t\u00eb r\u00ebnd\u00ebsish\u00ebm drejt transformimit mjedisor \u2013 n\u00ebnshkruhet kontrata p\u00ebr trajtimin e uj\u00ebrave shkarkuese n\u00eb TC Kosova B"},"content":{"rendered":"<p>Sot sh\u00ebnon nj\u00eb moment t\u00eb r\u00ebnd\u00ebsish\u00ebm n\u00eb rrug\u00ebtimin transformues t\u00eb Korporat\u00ebs Energjetike t\u00eb Kosov\u00ebs (KEK sh.a.), me n\u00ebnshkrimin e kontrat\u00ebs p\u00ebr realizimin e projektit \u201cTrajtimi i uj\u00ebrave shkarkuese nga Termocentrali Kosova B\u201d. <\/br><br \/>\nCeremonia u mbajt n\u00eb ambientet e TC Kosova B dhe mblodhi p\u00ebrfaq\u00ebsues t\u00eb lart\u00eb t\u00eb institucioneve vendore dhe nd\u00ebrkomb\u00ebtare, p\u00ebrfshir\u00eb Ministren e Ekonomis\u00eb, znj. Artane Rizvanolli, Ministren e Mjedisit, Planifikimit Hap\u00ebsinor dhe Infrastruktur\u00ebs, znj. Fitore Pacolli-Dalipi, p\u00ebrfaq\u00ebsuesin e Bashkimit Evropian, z. Hubert Perr, Drejtorin Ekzekutiv t\u00eb KEK-ut, z. Gramos Hashani, Kryesuesin e Bordit, z. Valdrin Krasniqi, si dhe Koordinatorin e OKB-s\u00eb p\u00ebr Zhvillim, z. Stephen O\u2019Malley. <\/br><br \/>\nN\u00eb kuad\u00ebr t\u00eb ceremonis\u00eb, u prezantua projekti nga p\u00ebrfaq\u00ebsuesi i UNOPS-it, z. Trevor Sway, duke theksuar objektivat, rezultatet e pritshme dhe ndikimin e tij n\u00eb p\u00ebrmir\u00ebsimin e cil\u00ebsis\u00eb s\u00eb mjedisit.<\/br><br \/>\nProjekti, me vler\u00eb t\u00eb p\u00ebrdit\u00ebsuar rreth 12 milion\u00eb euro, parasheh nd\u00ebrtimin e pes\u00eb impianteve t\u00eb avancuara p\u00ebr trajtimin e uj\u00ebrave shkarkuese (WWTP-A deri WWTP-E), t\u00eb cilat do t\u00eb trajtojn\u00eb n\u00eb m\u00ebnyr\u00eb t\u00eb integruar t\u00eb gjitha kategorit\u00eb e uj\u00ebrave \u2013 nga uj\u00ebrat industriale dhe t\u00eb kontaminuara me vajra, deri tek uj\u00ebrat atmosferike dhe sanitare.<\/br><br \/>\nP\u00ebrfitimet e k\u00ebtij projekti jan\u00eb t\u00eb qarta dhe t\u00eb matshme:<\/br><br \/>\n\u2022\treduktim mbi 90% i ndot\u00ebsve kryesor\u00eb n\u00eb uj\u00ebrat shkarkuese;<\/br><br \/>\n\u2022\teliminim pothuajse i plot\u00eb i vajrave, mazutit dhe hidrokarbureve;<\/br><br \/>\n\u2022\treduktim drastik i metaleve t\u00eb r\u00ebnda dhe substancave t\u00eb rrezikshme;<\/br><br \/>\n\u2022\tp\u00ebrputhje e plot\u00eb me standardet e Bashkimit Evropian;<\/br><br \/>\n\u2022\tp\u00ebrmir\u00ebsim i drejtp\u00ebrdrejt\u00eb i cil\u00ebsis\u00eb s\u00eb ujit n\u00eb lumin Sitnica.<\/br><br \/>\nP\u00ebr her\u00eb t\u00eb par\u00eb, t\u00eb gjitha uj\u00ebrat shkarkuese nga TC Kosova B do t\u00eb trajtohen n\u00eb m\u00ebnyr\u00eb t\u00eb kontrolluar, t\u00eb standardizuar dhe t\u00eb q\u00ebndrueshme, duke p\u00ebrdorur teknologjit\u00eb m\u00eb t\u00eb avancuara sipas standardeve BAT (Best Available Techniques), p\u00ebrfshir\u00eb trajtimin biologjik, filtrimin, adsorbimin me karbon aktiv dhe proceset kimike.<\/br><br \/>\nN\u00ebnshkrimi zyrtar i kontrat\u00ebs nd\u00ebrmjet Bashkimit Evropian dhe UNOPS-it u pasua nga sesioni i fotografimit zyrtar dhe nj\u00eb vizit\u00eb n\u00eb terren n\u00eb TC Kosova B, e udh\u00ebhequr nga p\u00ebrfaq\u00ebsuesit e KEK-ut.<\/br> <\/br><br \/>\nKy investim \u00ebsht\u00eb pjes\u00eb e nj\u00eb transformimi shum\u00eb m\u00eb t\u00eb gjer\u00eb t\u00eb KEK-ut. N\u00eb periudh\u00ebn 2025\u20132027, korporata \u00ebsht\u00eb duke realizuar projekte q\u00eb tejkalojn\u00eb vler\u00ebn prej 500 milion\u00eb euro, duke p\u00ebrfshir\u00eb modernizimin e nj\u00ebsive ekzistuese, investimet n\u00eb teknologji mjedisore dhe zhvillimin e kapaciteteve t\u00eb reja nga burimet e rip\u00ebrt\u00ebritshme.<\/br><br \/>\nKy projekt p\u00ebrfaq\u00ebson nj\u00eb hap konkret drejt transformimit t\u00eb KEK-ut n\u00eb nj\u00eb operator modern, efikas dhe t\u00eb q\u00ebndruesh\u00ebm, n\u00eb p\u00ebrputhje me standardet evropiane.<\/br><br \/>\nKEK sh.a. shpreh mir\u00ebnjohje p\u00ebr partner\u00ebt nd\u00ebrkomb\u00ebtar\u00eb p\u00ebr mb\u00ebshtetjen e vazhdueshme dhe p\u00ebr institucionet vendore p\u00ebr bashk\u00ebpunimin dhe p\u00ebrkrahjen n\u00eb realizimin e k\u00ebtij projekti me r\u00ebnd\u00ebsi t\u00eb ve\u00e7ant\u00eb p\u00ebr mjedisin dhe sh\u00ebndetin publik.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sot sh\u00ebnon nj\u00eb moment t\u00eb r\u00ebnd\u00ebsish\u00ebm n\u00eb rrug\u00ebtimin transformues t\u00eb Korporat\u00ebs Energjetike t\u00eb Kosov\u00ebs (KEK sh.a.), me n\u00ebnshkrimin e kontrat\u00ebs p\u00ebr realizimin e projektit \u201cTrajtimi i uj\u00ebrave shkarkuese nga Termocentrali Kosova B\u201d. Ceremonia u mbajt n\u00eb ambientet e TC Kosova B dhe mblodhi p\u00ebrfaq\u00ebsues t\u00eb lart\u00eb t\u00eb institucioneve vendore dhe nd\u00ebrkomb\u00ebtare, p\u00ebrfshir\u00eb Ministren e Ekonomis\u00eb,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":5041,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-5040","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lajme"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/5040","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=5040"}],"version-history":[{"count":6,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/5040\/revisions"}],"predecessor-version":[{"id":5047,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/5040\/revisions\/5047"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media\/5041"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=5040"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=5040"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=5040"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}