{"id":917,"date":"2012-01-13T12:51:07","date_gmt":"2012-01-13T12:51:07","guid":{"rendered":"http:\/\/kek-energy.com\/kek\/?p=917"},"modified":"2016-03-17T12:51:47","modified_gmt":"2016-03-17T12:51:47","slug":"sqarim-6","status":"publish","type":"post","link":"http:\/\/kek-energy.com\/kek\/sqarim-6\/","title":{"rendered":"Sqarim"},"content":{"rendered":"<p>KEK sh.a. sqaron se n\u00eb tekstin \u201c KEK-ut i anulohet tenderi p\u00ebr trafostacione\u201d, t\u00eb botuar n\u00eb numrin e t\u00eb m\u00ebrkur\u00ebs, dat\u00eb 11.01.2012 nuk jan\u00eb respektuar parimet e gazetaris\u00eb, sepse gazeta n\u00eb fjal\u00eb nuk e ka marr\u00eb fare mendimin e korporat\u00ebs dhe as q\u00eb kontaktuar me zyrtar\u00ebt p\u00ebr k\u00ebt\u00eb \u00e7\u00ebshtje. N\u00eb artikull ceket vet\u00ebm se KEK-u nuk \u00ebsht\u00eb pajtuar, por nuk ceket se pse, p\u00ebrderisa t\u00ebr\u00eb hap\u00ebsir\u00ebn ia kushton vendimit t\u00eb Organit Shqyrtues t\u00eb Prokurimit (OSHP).<\/p>\n<p>KEK-u sqaron se i ka d\u00ebrguar let\u00ebr OSHP-s\u00eb. Operatori Ekonomik (OE) ankues e kishte v\u00ebn\u00eb n\u00eb lajthitje OSHP-n\u00eb duke th\u00ebn\u00eb se ka paguar 50 euro p\u00ebr Dosje t\u00eb tenderit, p\u00ebrderisa KEK sqaron se nuk kishte k\u00ebrkuar para p\u00ebr dosje fare. KEK i kishte d\u00ebrguar OE-s\u00eb dosjen n\u00eb gjuhen shqipe dhe angleze, nd\u00ebrsa kishte koh\u00eb t\u00eb mjaftueshme q\u00eb k\u00ebt\u00eb ta k\u00ebrkonte edhe n\u00eb gjuh\u00ebn serbe. Data e fundit p\u00ebr ankes\u00eb ku mund t\u00eb k\u00ebrkohej edhe shtyrja e afatit ishte me 26.11.2011. OE nuk e kishte p\u00ebrfillur k\u00ebt\u00eb afat, duke e k\u00ebrkuar k\u00ebt\u00eb me 26 dit\u00eb vones\u00eb. P\u00ebr m\u00eb tep\u00ebr, KEK ka fakte t\u00eb mjaftueshme se kompanit\u00eb ankuese nuk jan\u00eb p\u00ebrdoruese t\u00eb gjuh\u00ebs serbe, madje edhe kur i jan\u00eb drejtuar KEK-ut p\u00ebr shtyrje t\u00eb afatit nuk e kan\u00eb p\u00ebrdorur k\u00ebt\u00eb gjuh\u00eb. N\u00eb nj\u00eb situat\u00eb t\u00eb till\u00eb \u00a0KEK-u ka k\u00ebrkuar nga Paneli Shqyrtues i OSHP q\u00eb ta hedh\u00eb k\u00ebt\u00eb ankes\u00eb si t\u00eb pabaz\u00eb pasi kishte konkurrenc\u00eb t\u00eb mjaftueshme dhe \u00ebsht\u00eb evidente q\u00eb dosja n\u00eb gjuh\u00ebn serbe si ka hyr\u00eb fare n\u00eb pun\u00eb OE-s\u00eb ankues, sepse k\u00ebt\u00eb do ta kishte po t\u2019i p\u00ebrfillte afatet e k\u00ebrkuara ligjore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KEK sh.a. sqaron se n\u00eb tekstin \u201c KEK-ut i anulohet tenderi p\u00ebr trafostacione\u201d, t\u00eb botuar n\u00eb numrin e t\u00eb m\u00ebrkur\u00ebs, dat\u00eb 11.01.2012 nuk jan\u00eb respektuar parimet e gazetaris\u00eb, sepse gazeta n\u00eb fjal\u00eb nuk e ka marr\u00eb fare mendimin e korporat\u00ebs dhe as q\u00eb kontaktuar me zyrtar\u00ebt p\u00ebr k\u00ebt\u00eb \u00e7\u00ebshtje. N\u00eb artikull ceket vet\u00ebm se KEK-u&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-917","post","type-post","status-publish","format-standard","hentry","category-lajme"],"_links":{"self":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/917","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/comments?post=917"}],"version-history":[{"count":1,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/917\/revisions"}],"predecessor-version":[{"id":918,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/posts\/917\/revisions\/918"}],"wp:attachment":[{"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/media?parent=917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/categories?post=917"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kek-energy.com\/kek\/wp-json\/wp\/v2\/tags?post=917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}